Industry / Critical infrastructureIND-02 / SECURITAS EX VIGILANTIA

Make communication part of operational resilience.

Critical operators must remain able to act when primary identities, networks or channels become uncertain. Connect separates situation communication, access decisions and recovery in a reviewable way.

AVAILABILITY · INTEGRITY · RECOVERY
Target state

Critical infrastructure

For these roles
  • Critical operators
  • OT and IT security
  • Emergency and crisis management
Expected outcomes
  • Prepared incident communication
  • Governed trust changes during compromise
  • Documented return to normal operations
OPERATING FLOW / 04

From event to reliable closure.

  1. 01

    Determine operational impact

    Service, location, dependencies and security boundary are classified first.

  2. 02

    Bound the incident room

    Only necessary roles gain access to confirmed situation information.

  3. 03

    Connect field and control

    Technical observations and operational decisions remain in one timeline.

  4. 04

    Approve recovery

    Return, remaining actions and ownership transfer are confirmed.

CONTROL MODEL

Controls that remain visible in operation.

C-01

Fallback communication

Alternative channel and activation authority are reviewed independently.

C-02

Least privilege

Incident roles receive only the visibility required for their phase and task.

C-03

Recovery gate

Normal operations resume only after technical and organisational approval.

C-04

Evidence boundary

Claims, observations and confirmed states remain distinguishable.

WORKING ARTEFACTS

Turn the concept into reviewable working state.

These artefacts are starting points for pilot and operations. They do not replace organisation-specific risk or legal review.

01

Communication dependency map

Identity, DNS, network, devices, key roles and fallback paths.

02

NIS2 control matrix

Communication-related measures, owners and reviewable evidence.

03

Recovery checklist

Trust, open actions, data reconciliation and approval before return.